Case Study Van Oord Logistics of wind turbine installation

Case Study Van Oord

 

Inschrijven voor de Cases Studies is niet meer mogelijk

 

VAN OORD DREDGING AND MARINE CONTRACTORS 

Logistics of wind turbine installation

9:00 - 11:00 - Penn Room 2 

 

Material shipping for an offshore project such as an offshore windfarm in itself is an undertaking in it's own right. You need to be able to work through various scenarios and methods taking into account risks and opportunities to derive at the optimum solution.

Van Oord will provide a case study based on a real offshore wind project situation to illustrate the logistic challenge. You will get the opportunity to sink your teeth into this challenge. During this case study you will be provided with the necessary information concerning origins of materials, destination location, and time constraints for delivery to make sure the installation operations can proceed without interruption. You will have to determine the optimum solution to shipping and planning, in numbers per trip, sailing time and overall costs for the logistics in order to assure project goals. Do you have what it takes to solve this puzzle? Have a go and present your solution to Van Oord during the case study.

Deze case study wordt in het Engels aangeboden. Tijdens je registratie voor MOCE kun je aangeven dat je mee wilt doen met deze case study.

Inschrijven voor de Cases Studies is niet meer mogelijk

Contact
info@moce.biz or +31 (0)10 2092600
Blijf op de hoogte Alle ins en outs over MOCE, volg ons op:
Bijblijven Schrijf je in voor onze nieuwsbrief
© 2018 MOCE.biz
Created & produced by:
Powered by HVMP Internet Marketing
Akkoord
Wij gebruiken cookies om de ervaring op onze website te verbeteren, statistieken bij te houden en je toegang te geven tot onze social media.
Door gebruik te maken van deze website of door op akkoord te drukken, ga je akkoord met onze privacy verklaring en gebruikersvoorwaarden. Je kunt de cookies ook niet accepteren.